LOC Consultants

Land-use entitlement firm · 13 unique cases
23
Hearings
13
Cases
7
Concluded
85.7%
Approved of concluded
2018–2026
Active
9
Since 2024

The record, at case level

Of LOC Consultants’s 13 unique cases, 7 have concluded — reached a Planning Commission or ZAP decision — and 6 of those ended in approval at their final hearing: 85.7%.

Postponement is a clock, not a verdict: of the 2 concluded cases postponed at least once, 2 still ended in approval (100.0%). At least 1 of these cases are confirmed adopted as Council ordinances (Council records run only through 2026-04-23, so this is a floor, not a rate).

Unique-case counts here are distinct case numbers. 8 of this record’s hearings also carry a case name but no number — but ~33% of those are the same matter as a numbered case already counted above, so the true unique-case count is a narrow range: 13 numbered, up to ~15 including the genuinely un-numbered matters. The case-level approval rate is computed on concluded numbered cases and is unaffected.

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

LOC Consultants: hearings by year2018: 2, 2019: 3, 2020: 2, 2021: 2, 2022: 2, 2023: 3, 2024: 7, 2025: 0, 2026: 2472’183’192’202’212’223’237’24’252’26

Outcome distribution

LOC Consultants: outcomesApproved: 7 (30%), Postponed: 12 (52%), Denied: 1 (4%), No decision: 3 (13%)30%52%13%Approved 7Postponed 12Denied 1No decision 3

Hearing timeline

Hearing dateOutcomeDistrictAgent
2026-03-24PostponedD2Sergio Lozano-Sanchez
2026-03-24PostponedD2Sergio Lozano-Sanchez
2024-10-22PostponedD2Sergio Lozano-Sanchez
Pro · Full record
The complete 23-hearings record is a Pro feature. See what Pro unlocks →

Where they practice

D2 10D3 5D7 1D8 1

Hearing-level rates, for comparison

Postponement rate vs the fieldLOC Consultants: 60%, Field median: 44%LOC Consultants60%Field median44%
Approval rate 35.0% — below the field (46.1%) by 11.1 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 35.0% (vs the field’s 46.1%) and postponement is 60.0% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

NPA-2023-0014.04C14-2025-0065NPA-2023-0014.03SP-2022-1387CC8-2022-0318.0AC8-2022-0147.0AC8-2021-0090.0ASP-2017-0187C(R1)