TEXAS ENTITLEMENTAustin Development Watch ›
Attorney profile

T. Walter Hoysa

Land-use attorney of record · 18 unique cases
25
Hearings
18
Cases
16
Concluded
87.5%
Approved of concluded
2016–2023
Active
0
Since 2024

The record, at case level

Of T. Walter Hoysa’s 18 unique cases, 16 have concluded — reached a Planning Commission or ZAP decision — and 14 of those ended in approval at their final hearing: 87.5%.

Postponement is a clock, not a verdict: of the 2 concluded cases postponed at least once, 2 still ended in approval (100.0%).

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

T. Walter Hoysa: hearings by year2016: 3, 2017: 2, 2018: 6, 2019: 5, 2020: 4, 2021: 3, 2022: 1, 2023: 1363’162’176’185’194’203’211’221’23

Outcome distribution

T. Walter Hoysa: outcomesApproved: 16 (64%), Postponed: 5 (20%), Denied: 2 (8%), No decision: 2 (8%)64%20%8%8%Approved 16Postponed 5Denied 2No decision 2

Hearing timeline

Hearing dateOutcomeDistrictFirm
2023-08-29PostponedD9LJA Engineering
2022-09-20Postponed(none)LJA Engineering
2021-12-21PostponedD1LJA Engineering
Pro · Full record
The complete 25-hearings record is a Pro feature. See what Pro unlocks →

Firm

LJA Engineering

Where they practice

D1 17D9 1D6 1

Hearing-level rates, for comparison

Postponement rate vs the fieldT. Walter Hoysa: 22%, Field median: 44%T. Walter Hoysa22%Field median44%
Approval rate 69.6% — above the field (46.1%) by 23.5 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 69.6% (vs the field’s 46.1%) and postponement is 21.7% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

SPC-2022-0162CC814-96-0003.18C8-2018-0122.4AC8-2016-0247.1AC8-2016-0247C8-2016-0109.7AC8-2017-0268.0ASPC-2017-0516C
Austin Development Watch · every figure traces to a certified record · hearing data through 2026-05-19 · Council outcomes through 2026-04-23 · gate-certified · generated 2026-07-29