Of T. Walter Hoysa’s 18 unique cases, 16 have concluded — reached a Planning Commission or ZAP decision — and 14 of those ended in approval at their final hearing: 87.5%.
Postponement is a clock, not a verdict: of the 2 concluded cases postponed at least once, 2 still ended in approval (100.0%).
Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.
| Hearing date | Outcome | District | Firm |
|---|---|---|---|
| 2023-08-29 | Postponed | D9 | LJA Engineering |
| 2022-09-20 | Postponed | (none) | LJA Engineering |
| 2021-12-21 | Postponed | D1 | LJA Engineering |
At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 69.6% (vs the field’s 46.1%) and postponement is 21.7% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.