TEXAS ENTITLEMENTAustin Development Watch ›
Attorney profile

Brian Faltesek

Land-use attorney of record · 8 unique cases
11
Hearings
8
Cases
8
Concluded
75.0%
Approved of concluded
2017–2022
Active
0
Since 2024

The record, at case level

Of Brian Faltesek’s 8 unique cases, 8 have concluded — reached a Planning Commission or ZAP decision — and 6 of those ended in approval at their final hearing: 75.0%.

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

Brian Faltesek: hearings by year2017: 4, 2018: 3, 2019: 2, 2020: 1, 2021: 0, 2022: 1244’173’182’191’20’211’22

Outcome distribution

Brian Faltesek: outcomesApproved: 6 (55%), Denied: 3 (27%), No decision: 2 (18%)55%27%18%Approved 6Denied 3No decision 2

Hearing timeline

Hearing dateOutcomeDistrictFirm
2022-02-01Approved(none)LJA Engineering
2020-02-04ApprovedD5LJA Engineering
2019-10-01ApprovedD5LJA Engineering
Pro · Full record
The complete 11-hearings record is a Pro feature. See what Pro unlocks →

Firm

LJA Engineering

Where they practice

D7 4D5 2

Hearing-level rates, for comparison

Postponement rate vs the fieldBrian Faltesek: 0%, Field median: 44%Brian Faltesek0%Field median44%
Approval rate 66.7% — above the field (46.1%) by 20.6 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 66.7% (vs the field’s 46.1%) and postponement is 0.0% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

C8-2021-0179.0ASPC-2019-0090CC8-2018-0165C8-2017-0038.1AC8J-2014-0131.2AC8J-2015-0271.2AC8-2015-0271.1AC8-2017-0038
Austin Development Watch · every figure traces to a certified record · hearing data through 2026-05-19 · Council outcomes through 2026-04-23 · gate-certified · generated 2026-07-29